Kia Motors Manufacturing

A prefabricated tie-in turned a one-day weekend window into a completed city-water filtration upgrade.

Master Wall

A process system documented, relocated, and reinstalled as the operation moved from Lithia Springs to Columbus. Operational within two months.

Blackmon Middle School

Prefabricated piping, new pumps, and heat exchangers installed in two weeks, leaving time to test before school operations resumed.

Great Wolf Lodge

One six-day shutdown window. A bucket assembly untouched since 2018. Bearings seized to the shaft. Removed, freed, and reinstalled on schedule.