Equipment moved, rigged, and set right.
Machinery moving and rigging, and equipment changeouts, planned before the first day on site and tested before they’re called done.
Have a project that crosses more than one category? Tell us what the work requires.
Move it. Swap it. Stand it back up.
Safety is built into the plan before the first day on site, not bolted on after.
Machinery moving & rigging
Safety built into the plan before the first day on site.
Equipment changeouts
Sequenced around what the facility can’t afford to stop.
Plan it. Rig it. Set it. Test it.
Drag the slider, or tap a stage, and follow a lift from plan to sign-off.
Plan the pick
Built into the plan before the first day on site, not bolted on after.
Great Wolf Lodge — Bucket Removal and Reinstall
A six-day shutdown window. Seized bearings cut from the shaft without damage, new bearings installed, and the bucket reinstalled on schedule.
Read the project storyMost jobs cross layers.
Piping, equipment, and structural work can run turnkey under one partner. Tell us what the work requires.
Before you ask.
Can you move and set machinery?
How do you plan a lift?
What about downtime during a changeout?
Where do you work?